+1.809.120.6705
Gracontruction@gmail.com
Graaf Florisstraat 22-A, 3021 CH Rotterdam
language
English
Offcanvas
Edit Template

Completed Projects

COMPLETED PROJECTS ROADS & BUILDINGS

NAME OF THE PROJECT
VALUE OF THE PROJECT
Comprehensive development of Infrastructure facilities for inter- nal roads, street lights, water supply, Customs office and com- pound wall in SEZ area and providing street light for the connec- tivity Road to SEZ from NH - 66 at SIPCOT Industrial complex, Bargur in Krishnagiri District.
70.28 Cr
Development of Temple city (250 Acres) by providing infrastruc- ture such as formation of roads, retaining walls, water supply, sewage, strom water drains, etc.
88.40 Cr
Improvement and reconstruction to 6 lane road with 2 lane service road on Khajaguda X road to Nanakramguda road from 0.0 Km to 2.80 Km
59.40 Cr
Construction of white topping (cement concrete road) for the four roads of i) Ameerpet (Kanakadurga temple) to Fathenagar Junction (3.5km) ii) Green Lands to Ameerpet (1.067km) iii) Rasoolpura Junction to Ranigunj Junction (Minister Road-1.728km) iv) Sanath- nagar Goods shed to Moosapet Jn (1.3 km)-HRDCL
54.20 Cr
Special Repairs to Bowenpally –Tirumalagiri - Moulali km 0/0 to 11/4 (Working reach km 4/0 to 11/4)
30.3 Cr
Special Repairs to Package VII for 1) Jublee check post to Ko- thaguda Junction Km 0/0 to 7/0, 2) NAC road Km 0/0 to 1/ 4, 3) KBR park road Km 0/0 to 5/300 and 4) NFCL Junction to KBR park entrance Km 0/0 to 2/750
20.30 Cr
Construction of VVIP cottages East facing (5 Nos) and VVIP cottag- es North facing (5 Nos) at Sri Lakshmi Narasimhaswamy Devasthanam, Yadadri,Yadadri Bhuvanagiri Dist., Telangana State.(PackageNo.II)
30.50 Cr
Construction of Retaining Wall at North-West side of Sri Lakshmi Narasimhaswamy Temple, in Yadagirigutta & Formation of inter- nal roads in the Ring road layouts between Temple Hillock, Ring road and Gandi Cheruvu Bund at Yadagirigutta in Yadadri Bhongiri District
205 Cr
Formation of internal roads in the ring road layouts between Temple Hillock, Ring road and gandi Cheruvu Bund at yadagirigut- ta in yadadri Bhongiri District
20.70 Cr
Formation of 6 lane Ring Road around Yadadri Temple along with New Ghat Road landing towards North-East corner and Link roads in Yadadri in Yadadri-Bhongir District
125.50 Cr

COMPLETED PROJECTS IRRIGATION

NAME OF THE PROJECT
VALUE OF THE PROJECT
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Filling of Anur and other surrounding 30 num- bers MI/ZP Tanks in Byadagi taluk of Haveri District By Lifting water from TungaBhadra River Near Kotihal in Ranebennur Taluk including Operation and Maintenance for a period of 5 years after commissioning of work on Turn-Key Basis.”
211 Cr
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Filling of Davaragudda and Surrounding Tanks in Ranebennur Taluk Haveri Dist.
10.12 Cr
Earth work Excavation formation of embankment CC lining with Mechanical paver including construction of CD works from km 11.00 to 15.00 of Mundarigi Branch Canal under SLIS
18.94 Cr
Earth work Excavation formation of embankment CC lining with Mechanical paver including construction of CD works from km 203.00 to 207.00 of UTP Main Canal
19.24 Cr
Earth work Excavation formation of embankment CC lining with Mechanical paver including construction of CD works from km 208.00 to 212.00 of UTP Main Canal
18.15 Cr
Construction of Chek Dams/Anicuts across Musi river (6 No’s) in Suryapet Mandal,(6 No’s) in Penpahad Madal&(7 No’s) across palair Vagu in Athmakur (S) mandal, Suryapet District.
105.02 Cr
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare