+1.809.120.6705
Gracontruction@gmail.com
Graaf Florisstraat 22-A, 3021 CH Rotterdam
language
English
Offcanvas
Edit Template

Ongoing Projects

NAME OF THE PROJECT
VALUE OF THE PROJECT
Construction of Buildings for Young India Integrated Residential School Complex at Andole
146.59 Cr
Upgradation of Government Hospital, Mangalagiri from 30 bedded to 100 bedded Area Hospital in Guntur District
34.54 Cr
Construction of buildings for Young India Integrated Residential School (YIIRS) Complex at Andole Assembly Constituency in Sangareddy District in Telangana State
140.16 Cr
Balance work Estimate for the work of Restoration of Buniyadigani canal from km 0.00 to 98.640 in Yadadri-Bhongir Dist. – including Distributory network system for a new ayacut 14,575 Acres and stabilization under MI tanks is about 6000 Acres (Telangana)
195.43 Cr
Balance work estimate of “Restoration of Dharmareddypally Canal in Yadadri - Bhongir District and Nalgonda District (Telangana)
81.09 Cr
Balance work estimate of “Restoration of Pillaipally Canal in Yadadri - Bhongir District and Nalgonda District (Telangana)
56.23 Cr
Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of Lift Irrigation Schemes MEHAKAR LIFT IRRIGATION SHEME STAGE-I (KNNL) Karnataka
50.90 Cr
Permanent restoration of roads at Eluru District (Andhra Pradesh)
4.5 Cr
9 Survey, Investigation, Design, Supply, Installation, Testing and Commissioning of “Filling up of 94 Tanks in Honnali taluk of Dava- nagere District by lifting of water from Tungabhadra river near Govinkovi Village and Hanumasagara Village in Honnali Taluk, Davanagere District
330.80cr
Improvements to tanks coming under Govinkovi and Hanuma- sagar Tank Filling Scheme in Honnali in Davangere district.
68.23 Cr
Constructions of (ST) kitur Rani Chennamma Residential chool Complex At Hatcholi of Siruguppa Taluk In Ballari2.Construction o (SC) Dr.B.R Ambedkar Residential chool Complex At karur of Siru- guppa Taluk In Balllari District3.Construction of (ST) Kittur Rani Chennamma Residential SchoolComplex At Hirehagadal Of Kudli- gi Taluk In Ballari District Karnataka
68.87 Cr
Multi Village Water Supply Scheme to Nidugurthi and other 60 Habitations in Sandur Taluk of Ballari District through Design, Build, Operate, and Transfer (DBOT) mode under Jal Jeevan Mission
122.40 Cr
Consists of 30 road work in Budvel Constituency of YSR Kadapa District
35.00 Cr
Construction of PQC Roads and drains at yadadri power Plant
69.00 Cr
Construction of RCC Slab over deep reaches of side drains of main roads for safety purpose in unit-2 Navanagar Bagalkot
30.20 Cr
Providing External Water Supply facilities to IP Gopavarm(V) Gopavaram (M) YSR Kadapa District, Andhra Pradesh.
28.54 Cr
Deployment & operations of auto tippers for door to door waste collection in ULBs in ZONE-1: Visakhapatnam region (5 Years)
378.6 Cr
Manufacture, Supply and Delivery of 3 Cum capacity Desludging Vehicles
30.10 Cr
Investigation Survey Design and Construction of Sewage Treat- ment Plants at suitable locations in Cluster 10,11,12 in the State of Andhra Pradesh with Open Technology including 02 two years Defect Liability Period
210.00 Cr
Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare